IT Consulting · Case Study

Zenith Supply Chain

How Zenith Supply Chain partnered with Vefytech for IT consulting and architecture advisory, reducing dispatch turnaround by 65% and unifying telematics across 14 distribution hubs.

Industry

Enterprise Logistics & Fleet Networks

Scale

14 regional distribution hubs, 420+ transport assets, 35k daily consignments

Location

Gurugram & Pune, India

Leadership

Vikramaditya Singhania — VP of Operations & Technology

Client Perspective
“Vefytech's architectural audit revealed where our legacy ERP and GPS telemetry were drifting out of sync. Their advisory roadmap didn't just solve our dispatch lag—it gave our operations leadership real-time visibility across 14 hubs without rebuilding from scratch.”

— Vikramaditya Singhania, VP of Operations & Technology, Zenith Supply Chain

The Challenge

Operational friction before Vefytech.

Zenith Supply Chain operates 14 regional distribution centers handling multi-carrier routing and high-throughput warehousing. Over six years of rapid expansion, the company accumulated five disparate software tools: a legacy on-premise ERP, third-party GPS tracking portals, spreadsheet-based driver manifest records, and isolated warehouse gate passes.

Data between hubs lagged by up to six hours. Dispatch managers had to manually reconcile physical lorry loading manifests with central stock allocations, leading to prolonged gate turnaround, missed route windows, and frequent detention penalties.

Executive leadership was contemplating an expensive multi-million rupee total system replacement, but lacked clarity on where the core data friction actually resided.

Methodology

Understand. Diagnose. Design. Execute.

01 // Understand

Multi-Hub Operational & Data Flow Audit

We conducted field audits across primary distribution hubs and interviewed dispatch controllers, fleet captains, and IT infrastructure leads to trace consignment data journeys.

02 // Diagnose

Telemetry Latency & Siloed Gate Logging

We identified that 82% of dispatch delays originated from batch-file synchronization gaps between the gate pass system and central ledger, not the warehouse floor machinery.

03 // Design

Event-Driven Integration Architecture

We architected an event-driven middleware blueprint and unified API protocol connecting GPS telematics, gate-scan hardware, and the central Connect platform.

04 // Execute

Roadmap Advisory & Progressive Rollout

We guided Zenith's internal engineering team through staged implementation, establishing resilient edge gateways and automated driver dispatch dashboards across all 14 centers.

The Solution

Built on Connect / IT Advisory.

Vefytech delivered strategic IT consulting and enterprise systems architecture centered on Vefytech Connect, harmonizing legacy telemetry with automated hub operations.

Key Capabilities Deployed

  • 01Event-driven hub telemetry bridge syncing dispatch statuses in sub-second intervals
  • 02Automated digital driver gate pass generating instant QR verification at checkpoints
  • 03Unified operational control tower giving regional directors cross-hub inventory tracking
  • 04Phased modernization advisory eliminating the capital expense of total system replacement

Business Impact

Measured operational results.

Clear operational outcomes delivered through deliberate system architecture.

65% faster dispatch cycle

Average vehicle gate-in to gate-out turnaround time decreased from 85 minutes to under 30 minutes.

Zero cross-hub data lag

Consignment ledger updates synchronized instantly across all 14 regional distribution hubs.

99.2% on-time dispatch SLA

Dispatch predictability climbed to an all-time company high within 90 days of rollout.

Start with clarity

Tell us what you need.

Share your goals, current setup, and challenges. We’ll help you find the right next step without the complexity.

Get in touch

No obligation. A conversation focused on your business.